Fuel bowsers
Dongfeng 7.7 m³ Fuel Bowser (CL5100GJY6BWG)
7.7 m³ fuel bowser built on Dongfeng EQ1100SJ8EDF 4x2 chassis with 110–120 kW National VI diesel engine, 5,140 kg rated payload, and bottom-loading vapour recovery system.
- Model
- CL5100GJY6BWG
- Chassis
- Built on Dongfeng chassis (EQ1100SJ8EDF)
- Capacity / duty
- 7.7 m³ (7,700 L)
- Steering side
- LHD standard · RHD subject to order confirmation
The CL5100GJY6BWG is a 7.7 m³ fuel bowser built on a Dongfeng EQ1100SJ8EDF 4x2 diesel chassis, engineered for mobile refuelling and metered fuel delivery across construction sites, logistics yards, and regional depots. Configured with a 9,900 kg GVW, 5,140 kg rated payload, and Euro-standard bottom-loading and vapour recovery hardware, it pairs a Q235 carbon steel tank with a high-flow fuel transfer pump. Final pricing is quoted on request according to engine selection, dispenser specification, safety fittings, and FOB/CIF trade terms.
Key Technical Specifications
| Parameter | Specification |
|---|---|
| Vehicle Model | CL5100GJY6BWG |
| Manufacturer | Chengli Automobile Group Co., Ltd. (程力汽车集团股份有限公司) |
| Chassis | Built on Dongfeng chassis (EQ1100SJ8EDF) |
| Drive Layout / Steering | 4x2; RHD subject to order confirmation |
| Tank Volume | 7.7 m³ (7,700 L) |
| Tank Material & System | Q235 carbon steel plate; high-flow fuel pump (pump-in/pump-out); bottom-loading valve, vapour recovery, anti-overflow probe, emergency bottom valve |
| Engine Options | D25TCIF1 (110 kW, 2,499 mL) / YN25PLUS160B (114 kW, 2,499 mL) / ZD30D16-6N (120 kW, 2,953 mL) diesel |
| Emission Standard | GB17691-2018 National VI |
| Overall Dimensions (L × W × H) | 6,600 × 2,200 (2,330) × 2,800 mm |
| Wheelbase | 3,390 / 3,600 / 3,800 mm |
| GVW / Curb Weight / Rated Payload | 9,900 kg / 4,565 kg / 5,140 kg |
| Axles / Tyres | 2 axles; 6 tyres (215/75R17.5, 245/70R19.5 14PR, 8.25R16 16PR, 8.25R16, or 215/75R17.5 16PR) |
| Maximum Speed | 80 km/h |
Operational Overview
With three wheelbase choices (3,390 mm, 3,600 mm, and 3,800 mm) and a 6,600 mm overall length, the CL5100GJY6BWG balances 7.7 m³ fuel capacity with urban and regional site access. Standard superstructure equipment includes folding top guardrails, reflective hazard striping, flammable liquid placards, and a side toolbox, while dispenser flow rate and metering options are configured to buyer requirements.
Vehicle Positioning & Key Highlights
The CL5100GJY6BWG is a 7.7 m³ fuel bowser built on a Dongfeng 4x2 diesel chassis for fleet operators, construction contractors, and commercial refuelling depots. Equipped with a Q235 carbon steel tank, high-flow fuel transfer pump, and bottom-loading vapour recovery fittings, it delivers 5,140 kg rated payload across urban and regional routes.
- Built on Dongfeng EQ1100SJ8EDF 4x2 chassis with 9,900 kg GVW and 5,140 kg rated payload
- 7.7 m³ Q235 carbon steel tank with high-flow pump-in/pump-out fuel transfer pump
- European-standard bottom loading, vapour recovery, anti-overflow probe, and emergency bottom valve
- Three National VI diesel engine options (110 kW, 114 kW, or 120 kW) and three wheelbase configurations
- Folding top guardrails, reflective safety markings, flammable liquid placards, and toolbox
Operational Capabilities & Sizing Context
7.7 m³ tank volume / 5,140 kg rated payload
Transports up to 7,700 litres (subject to specific gravity and rated 5,140 kg payload limits) for mobile fleet refuelling across dispersed job sites.
Basis & operating factors: Based on 7.7 m³ nominal tank volume, 9,900 kg GVW, and 5,140 kg rated payload. Actual usable fuel mass depends on fuel specific gravity (e.g., diesel vs. petrol), ullage expansion allowance, optional dispenser weight, and destination road axle-load rules; values are engineering figures, not guaranteed operational outputs.
Bottom-loading & vapour recovery fuel transfer system
Supports closed bottom loading at depots with vapour recovery and controlled refuelling at customer machinery or fleet yards.
Basis & operating factors: Pump-in/pump-out high-flow fuel transfer pump paired with European-standard bottom-loading valve, vapour recovery interface, anti-overflow probe, and emergency bottom valve. Actual transfer speed depends on hose diameter, viscosity, ambient temperature, and PTO speed.
Technical specifications
| Parameter | Specification |
|---|---|
| Vehicle Model | CL5100GJY6BWG |
| Chassis | Built on Dongfeng chassis (EQ1100SJ8EDF) |
| Drive Layout | 4x2 |
| Tank Volume | 7.7 m³ (7,700 L) |
| Engine Options | D25TCIF1 (110 kW) / YN25PLUS160B (114 kW) / ZD30D16-6N (120 kW) |
| Emission Standard | GB17691-2018 National VI |
| Overall Dimensions (mm) | 6,600 × 2,200 (2,330) × 2,800 |
| Wheelbase (mm) | 3,390 / 3,600 / 3,800 |
| GVW / Curb / Payload (kg) | 9,900 / 4,565 / 5,140 |
| Tyres | 6 × (215/75R17.5 / 245/70R19.5 / 8.25R16 options) |
| Max Speed (km/h) | 80 |
Chassis configuration
| Axles | 2 |
|---|---|
| Chassis brand | Dongfeng |
| Chassis model | EQ1100SJ8EDF |
| Drive layout | 4x2 |
| Engine displacement ml | 2499 / 2953 |
| Tyre count | 6 |
| Tyre model | 215/75R17.5, 245/70R19.5 14PR, 8.25R16 16PR, 8.25R16, 215/75R17.5 16PR |
| Wheelbase mm | 3390 / 3600 / 3800 |
| Width options mm | 2200 / 2330 |
Body and tank configuration
| Tank material | Q235 carbon steel plate |
|---|---|
| Tank volume l | 7700 |
| Tank volume m3 | 7.7 |
| Top safety rails | Folding lifting guardrails on both sides of tank top |
Working equipment
| Bottom loading | European-standard bottom loading, vapour recovery, and anti-overflow probe |
|---|---|
| Pump | High-flow fuel transfer pump (pump-in / pump-out) |
| Tank material | Q235 carbon steel plate |
| Tank volume m3 | 7.7 |
Performance and operating conditions
| Max speed kmh | 80 |
|---|---|
| Rated power kw | 110 / 114 / 120 |
Fuel tanker & dispensing system
| Bottom loading package | European-standard bottom loading/unloading valve, vapour recovery valve and interface, anti-overflow probe and socket |
|---|---|
| Manhole and valves | European-standard manhole cover and emergency bottom (seabed) valve |
| Pump system | High-flow fuel transfer pump (pump-in and pump-out capability) |
| Tank material | Q235 carbon steel plate |
| Tank volume m3 | 7.7 |
Applications & Operating Conditions
Primary use: Mobile fleet refuelling and metered diesel or petrol delivery
Typical applications: Mobile refuelling for excavators, loaders, agricultural tractors, backup generators, and regional depot-to-site fuel distribution.
Suitable operating conditions
- Paved urban roads, regional highways, and compacted construction or quarry access roads
- Fleet yards and remote equipment sites requiring 7.7 m³ mobile fuel delivery
Unsuitable conditions & limits
- Deep mud, uncompacted off-road terrain, or steep gradients beyond 4x2 highway chassis limits
- High-pressure LPG or corrosive chemical transport (dedicated pressure/chemical vessels required)
Configuration trade-offs to review
- 7.7 m³ medium-duty 4x2 bowser vs. 2.2–2.8 m³ light-duty bowser
- The 7.7 m³ build reduces refill trips for multi-machine job sites and commercial fleets, while lighter 2.2–2.8 m³ bowsers offer tighter turning circles in narrow urban lanes.
- 110–114 kW 2.5 L Yunnei engines vs. 120 kW 3.0 L ZD30D16-6N engine
- The 2.5 L options prioritise lower kerb weight and fuel economy on flat regional routes, whereas the 120 kW ZD30D16-6N provides stronger torque reserve on hilly terrain.
Equipment & Safety Configuration
Standard equipment
- Dongfeng EQ1100SJ8EDF 4x2 diesel chassis
- 7.7 m³ Q235 carbon steel tank body
- High-flow fuel transfer pump (pump-in/pump-out)
- European-standard bottom-loading valve, vapour recovery system, anti-overflow probe, manhole cover, and emergency bottom valve
- Folding tank-top guardrails, reflective markings, flammable liquid placards, and toolbox
Optional equipment
- Metered fuel dispenser with hose reel and nozzle
- Multi-compartment tank partitioning for separate fuel grades
- Right-hand drive (RHD) chassis build (subject to order confirmation)
Safety configuration
- Emergency bottom (seabed) shut-off valve
- Anti-overflow probe and socket with vapour recovery interface
- Folding tank-top guardrails, reflective hazard tape, and three flammable liquid signs
Quotation, Delivery, Inspection & Support
Quotation basis
Quoted on request in USD or CNY under FCA, FOB, CFR, CIF, CIP, or DAP terms. Pricing depends on chassis/superstructure specification, optional fittings, destination compliance, and order quantity. Standard payment terms are 30% deposit and 70% balance before shipment via T/T or L/C.
Lead time & shipping
Lead time: Typically 30–90 days after deposit confirmation (subject to chassis availability and formal contract)
Shipping methods: Container / Flat Rack; Break-bulk Vessel; Ro-Ro Vessel (for bulk fleet orders)
Exported from major Chinese ports including Shanghai, Wuhan, Ningbo, Lianyungang, Qingdao, Tianjin, or Guangzhou. Import customs clearance and local vehicle registration at the destination port are the buyer's responsibility.
Factory & third-party inspection
Video inspection and on-site factory inspection are supported at Chengli Automobile Industrial Park, Zengdu Economic Development Zone, Suizhou City 441300, Hubei Province, China. Third-party pre-shipment inspection (such as SGS or BV) is accepted, with inspection fees normally borne by the buyer.
Warranty & after-sales support
12-month warranty on the superstructure; chassis warranty of 12 months is subject to the chassis OEM's terms. Genuine spare parts support is provided for 5 years. English operation manuals and instructional videos are supplied as standard (other languages available on request), with online technical support typically responding within 24 hours. Inquiry email: [email protected].
Certification & export documentation
Group certifications: ISO 9001, ISO 14001, ISO 45001, CCC
Factory delivery documents: China CCC Certificate, Factory Certificate of Conformity, Destination conformity inspection report on buyer request
Group certifications apply to Chengli Automobile Group management systems and do not automatically constitute destination-market ADR, ASME, ATP, GDP, WHO PQS, KEBS, or SONCAP approval for an individual vehicle; destination compliance is confirmed per order.
Information to include in your RFQ
- Destination country and import port
- Preferred trade terms (FOB, CFR, CIF, FCA, CIP, or DAP)
- Required steering configuration (LHD or RHD confirmation)
- Fuel media (diesel, petrol, or multi-grade) and required fuel dispenser / flow meter configuration
- Preferred engine option (D25TCIF1, YN25PLUS160B, or ZD30D16-6N) and wheelbase (3,390 / 3,600 / 3,800 mm)
- Order quantity and valid contact email or messaging details
- Confirm required fuel grade(s), compartment count, and metered dispenser specifications
- Verify destination dangerous-goods tank inspection, ADR/local homologation, and emission standard requirements
- Confirm LHD or RHD steering availability and preferred engine/wheelbase combination
- Confirm tyre specification and destination axle-load compliance
Questions before you order
What are the tank capacity and payload ratings of the CL5100GJY6BWG fuel bowser?
The CL5100GJY6BWG has a 7.7 m³ (7,700 L) tank volume, 9,900 kg GVW, 4,565 kg curb weight, and 5,140 kg rated payload.
Does the CL5100GJY6BWG include bottom loading and vapour recovery?
Yes. Standard specification includes a European-standard bottom-loading valve, vapour recovery valve and interface, anti-overflow probe with socket, European-standard manhole cover, and emergency bottom valve.
Can the CL5100GJY6BWG be supplied in right-hand drive (RHD)?
Right-hand drive (RHD) is subject to order confirmation. Please indicate your destination country and steering requirement when submitting your RFQ so we can confirm RHD Dongfeng chassis availability.
What are the warranty terms and delivery lead time?
The superstructure carries a 12-month warranty and the chassis carries a 12-month warranty subject to the chassis OEM's terms, with 5 years of spare parts support. Lead time is typically 30–90 days after deposit confirmation.