BUYING & OWNERSHIP FAQ
Purchasing, delivery and support: your questions answered
Use these answers to prepare a buying brief, understand the order stages and plan the people and information needed after delivery.
Before requesting a quotation
What information makes a quotation useful?
Send the cargo or working duty, requested capacity or payload, quantity, chassis preference, LHD or RHD, country and named port or place. Add route or site restrictions, the required trade term and any import or inspection document list. If a figure is undecided, explain the working cycle so the requirement can be discussed.
Can the body and equipment be tailored to our operation?
Describe the required body, loading or discharge method, operator access and installed equipment. The proposed configuration is reviewed for the actual chassis and duty. Mandatory items should be separated from preferences, and the supplied equipment and remaining open points should be identified in the written proposal.
Can I request a particular chassis and RHD?
Yes. Include the preferred brand and exact model if known, the steering side and drive arrangement in the initial brief. Availability is reviewed for the exact chassis-body combination. The quotation should identify what is offered; a category image does not establish availability of every variant.
Are the website pictures the exact specification I will receive?
Pictures show vehicle families, manufacturing or company activities and help explain the application. The accepted order configuration identifies the supplied vehicle, components and equipment. Use that record for inspection, particularly where doors, fittings, control positions, pumps, cooling units or lifting equipment are important to the job.
Price, payment and timing
Which currencies and payment methods are accepted?
Quotations and payments are generally in US dollars or renminbi. Telegraphic transfer and letters of credit are accepted. Include the preferred currency and any bank or LC requirements in the enquiry so they can be discussed with the commercial terms.
What is the usual deposit and balance arrangement?
The usual structure is 30% deposit and 70% balance, normally before dispatch. Special vehicles and orders may have different arrangements. The written quotation and contract set the payment stages and the supply to which they relate.
Which trade terms can be discussed?
FCA, FOB, CFR, CIF, DAP and CIP are available for discussion. State the term together with the named port or place. Check the proposal for the freight, insurance, inspection, training and optional-spares items included so quotations are compared on the same basis.
How long does production take?
Production is normally 30–90 days after the deposit. Inspection, transport booking, the sea or inland journey, destination clearance and onward delivery are separate stages. Tell the team about a project deadline at enquiry and use the agreed order schedule for planning.
Inspection, shipping and documents
Can I inspect the vehicle before dispatch?
Video and factory inspections are supported. Buyers may attend or appoint a third-party inspection organisation; third-party fees are normally paid by the buyer. Agree the checklist, documents, working functions to demonstrate, participants and timing before the inspection.
Where are factory visits arranged?
The stated factory inspection address is Chengli Automobile Industrial Park, Zengdu Economic Development Zone, Suizhou City 441300, Hubei Province, China. Confirm the location relevant to your vehicle and visit arrangements with the team before booking travel. The Wuhan sales office and the manufacturing visit are separate arrangements.
What vehicle documents can be supplied?
Vehicle CCC and product conformity certificates are normally provided, or a product consistency inspection report can be arranged against the requirements of destination customs and relevant authorities. Send the importer requirements early. The agreed document list must match the actual vehicle and destination.
Does a group certificate approve every vehicle?
No. Read a certificate for its holder, scope, model and validity period. A group management-system credential or a historical certificate image does not establish current approval of every truck, body, tank or pressure vessel. Request the documents relevant to the quoted configuration.
How can the vehicles be shipped?
Containers, flat racks and breakbulk are usual approaches; larger-volume orders may use RoRo. Booking can be arranged by Chengli or the buyer as agreed. The method depends on the actual vehicle, order and route. Common Chinese dispatch ports include Shanghai, Wuhan, Ningbo, Lianyungang, Qingdao, Tianjin and Guangzhou.
Who handles destination clearance and registration?
The buyer handles destination customs clearance and vehicle registration. Have the importer review the offered configuration and document requirements before the order is accepted. Name the receiving port and inland destination, and identify the party arranging the onward leg.
Warranty, parts and operator preparation
How are chassis and body warranty handled?
The usual chassis warranty is 12 months, with measures confirmed by the chassis OEM. The body department normally provides 12 months of warranty. Covered warranty-period costs are borne by Chengli under the applicable policy. Keep the order and vehicle identities available when asking for assistance.
Are every repair and all consumables covered?
The general warranty covers defects in materials or workmanship under its conditions. Routine consumables such as filters, lubricants and tyres, and damage caused by misuse, accidents, neglect or unauthorised modification or repair, are excluded. The applicable warranty and order conditions determine how a claim is assessed.
What should I send when reporting a fault or ordering parts?
Include the order reference, chassis and body identification, equipment nameplate or part reference, clear photographs and a description of the symptoms. Explain when the issue occurs, any warning indication and action already taken. These details help connect the enquiry with the actual assembly and support route.
How long is parts support available?
Parts support is provided for five years. Discuss initial spares and routine consumables against the actual configuration before dispatch, especially for a remote operation or a first vehicle in the fleet. Parts support does not mean every part is held at every destination or that all consumables are free.
What manuals and technical help are available?
Manuals and model-specific instructional videos are mainly in English; other languages can be arranged according to customer needs. Online technical support is available through the website and sales team. Use [email protected] and include the order and vehicle details so the enquiry can be directed correctly.
What does factory training cover and who pays travel costs?
Training can cover the complete vehicle, body-system and major-component operation and maintenance for the relevant operators and technicians. Chengli pays accommodation, meals and local transport during factory training. The customer pays international travel. Agree the equipment, participants, language needs and dates beforehand.
Can an engineer provide guidance overseas?
Overseas on-site guidance can be arranged. Airfare, visa and accommodation are paid by the customer or set in the contract, with no additional engineering service charge. Discuss the task and timing in advance; the arrangement is not a promise of a permanent local workshop or immediate attendance in every country.
How do we start a dealer or fleet cooperation discussion?
Send your company name, address, contact person, business description, country, customer sectors, intended range and service capability. Add a practical first requirement with quantity and timing. Pricing, territory, training and other partnership terms are discussed and recorded for the cooperation.
LET’S SPECIFY YOUR NEXT TRUCK
The right truck starts with the right brief.
Tell us the working duty, destination and preferred delivery terms.